600 Ton Double Girder Overhead Crane Solution
2026 May, Henan Mine Crane 600t new double girder Overhead Crane completed installation and commissioning, settled in the domestic high-end marine equipment manufacturing base.

default
After the equipment is put into use, it is specially designed to meet the production and assembly needs of large-scale offshore wind turbines of 30MW and below.
The product innovatively adopts double trolley cooperative structure, supporting independent operation or synchronous linkage lifting.

It effectively solves the problem of lifting super-long and super-heavy components of wind power and improves the overall capacity of offshore workshop.

The whole machine is equipped with full frequency conversion and PLC intelligent control system, realizing millimeter-level accurate positioning and intelligent anti-shaking.
Relying on the light and heavy load automatic speed change design, it realizes green energy saving and consumption reduction while ensuring safety.
The equipment is equipped with a full-dimensional safety protection system and a high-strength load-bearing main beam.
600 tons of heavy-duty working conditions and stable operation, building a solid safety bottom line for large components lifting.

Over the years, Henan Mine Crane supporting Jingneng, Yunda, CNR and other head wind power manufacturers.
The same series of wind power cranes are exported to overseas, and can be customized lifting solutions for global offshore wind power projects.