Henan Mine Crane specializing in energy engineering for power plants landed in the project
In May, 2026, Henan Mine Crane’s lifting equipment was put into the construction of 2×350MW cogeneration project in Jimushar, Xinjiang.

The project is jointly developed by the State Power Investment Corporation (SPIC), China Electricity Construction Corporation (CECC), Hubei Engineering Corporation (HEC) and other large central enterprises.
The project site working conditions are harsh, accompanied by high temperature, dust and other environmental problems.
Henan Mine Crane customized power plant lifting solutions.
The lifting equipment is equipped with full frequency conversion speed control and PLC intelligent control system, and the positioning of lifting is accurate and controllable.
The key construction task of lifting the generator stator of Unit 1 was completed efficiently to ensure the construction progress of the project.

The whole machine adopts anti-corrosion and dust-proof high-end parts, adapting to the harsh environment of the power plant and extending the service life of the equipment.
Relying on the quality control of the whole life cycle, the company realizes the advantages of green, intelligent and safe products.

In addition to the domestic thermoelectric power project landing, the same type of power plant cranes have been batch applied to overseas energy projects.
Henan Mine Crane can provide one-stop customized lifting supporting services for global thermal power and cogeneration projects.